The One Star Landed And Your Crew Goes Back In There Tomorrow

The One Star Landed And Your Crew Goes Back In There Tomorrow

Six forty in the morning, day four of a two week remodel, and the phone buzzes with a notification nobody wants to read before coffee.

Two stars. Dust everywhere, nobody told us the water would be off, and the guys showed up at ten thirty twice.

The kitchen is still half gone. There are four of your people due at that address in two hours. The tile has not even been set yet, so whatever this review is about, it is not about whether you do good work.

Every piece of advice about bad reviews assumes the job is over and the customer is gone. This one is different, because you have to walk back through that door.

The review is not the conversation

First instinct is to answer it, because that is what you have been taught to do with a bad review. Resist that for one day.

A public reply while the work is live turns a fixable complaint into a negotiation with an audience. Now the customer is not telling you about the dust, they are defending a position in front of strangers. People dig in when they are being watched. So do owners.

There is a second reason, and it is the one most people miss. Your crew reads these. Reply publicly before you have talked to anybody and the first version of the story your own team gets is the version you wrote for the internet.

The conversation happens in person, today, before anything gets typed anywhere.

What a mid-job review is almost always about

Nobody can judge the workmanship on day four. The work is not finished and they know it.

Read the complaint again and it is usually about not knowing what was going to happen. The water being off was a surprise, and so was the arrival time. So was the amount of dust, to somebody who has never lived through a demolition before.

That is a communication failure, not a quality failure, and the difference matters because it changes what you do next. If the tile were bad you would owe them a rebuild. What you actually owe them here is a heads up they never got.

Which is good news on one level and uncomfortable on another, because the heads up was free and somebody on your side skipped it.

Go yourself, same day

Not the foreman. Especially not the foreman if he is the person named in it.

Owner on site, same day, and the reason is not politeness. You are the only person who can change the plan for the rest of the week, and changing the plan is the only thing that will actually settle this.

Do not open with the review. Opening with the review makes it a confrontation and tells them the public post is what got your attention, which is a lesson you do not want them to learn.

Open with the week. What is happening Thursday, when the water goes off again and for how long, who is arriving and at what time. Then give them your cell for when any of that slips.

Then ask one question: what does the rest of this need to look like for you.

The part about asking them to take it down

You get one mention of it, and the timing is strict.

Not now. Not while there is still work to do and a balance to collect, because any version of that ask sounds like a condition. Nobody owes you anything in exchange for finishing the job they already paid for.

After the job is done, after the thing that bothered them is genuinely handled, you can say once that you would appreciate it if they would take another look at the review now that it is finished. Once, in a normal voice, with no discount attached, and then never again regardless of what they do.

Most people who are happy at the end will update it on their own. Some will not, and that is the price of the thing your team skipped on day three.

What to tell your crew

They already saw it. Pretending otherwise is worse than addressing it.

Say it flatly and once, at the start of the day. There is a two star, here is what it says, here is what we are changing for the rest of the week. Do not pass along the customer's tone, and do not let the job become a grudge, because the customer is still a person your people have to be polite to for nine more days.

And whoever skipped the heads up does not get taken apart in front of everybody. That is a separate conversation on a different day.

Do this

  1. 1Do not reply publicly while the job is still running.
  2. 2Go to the site yourself the same day, and do not send the person named in the review.
  3. 3Lead with the schedule for the rest of the job rather than with the review.
  4. 4Ask what the rest of the week needs to look like, then write down the answer.
  5. 5Fix the communication gap for every other active job today, because it is almost never only this customer.
  6. 6Brief your crew once, without passing on the customer's tone.
  7. 7Reply publicly after the work is complete, short, and about the finish rather than about the complaint.
  8. 8Mention a second look at the review exactly once, after the job is done, with nothing attached to it.

Where the card fits

Worth sitting with one detail here: the first time this customer told you how it was going was on Google.

That is not because they are difficult. It is because there was no easier way for them to say it. No check in, no end of day text, nothing that invited a small complaint while it was still small.

A tap card is for the other end of that job, the day it is finished and the kitchen looks the way it was supposed to look, when the opinion they have is worth having in public and the only thing standing in the way is a search bar. One tap, straight to your review page, while standing in the room they are happy about.

Build the small channel for mid-job complaints and the easy channel for finished-job praise. Cards and stands are at shop.optechsol.llc.

The short version

A bad review posted mid-job is a communication complaint, not a quality complaint, because nobody can judge unfinished work. Do not answer it in public yet. Go to the site yourself the same day, lead with the schedule instead of the review, ask what the rest of the job needs to look like, and fix the same gap on every other job you have running. Reply publicly once the work is done, and ask for a second look exactly once, with nothing attached.